St. Sovereign • Fleet & Energy Division
EV Charging Infrastructure & Capital Pricing Schedule
Hardened Level 2 & Level 3 DC Fast Charging architectures, microgrid energy storage integration, and fully itemized turnkey installation schedules for municipal fleets and commercial properties.
Municipal Financing Notice: All EV charging infrastructure hardware, civil work, and site telemetry qualify for 10-Year Tax-Exempt Lease Purchase (TELP) financing under Cal. Gov. Code § 7929.210 ($0 initial General Fund outlay).
Turnkey Hardware & Installation Pricing Matrix
Standardized deployment ranges based on power output, site prep, and grid interconnect requirements.
| Infrastructure Category | Hardware & Civil Deployment Scope | Turnkey Installed Cost |
|---|---|---|
| Level 2 Commercial / Fleet Pedestal | Hardened dual-port pedestal, NEMA enclosure, site load controller, basic conduit run, and initial OCPP cellular gateway provision. | $8,700 – $18,000 / unit |
| Level 3 DC Fast Charger (150kW – 350kW) | High-output power cabinet, liquid-cooled dispenser, FIPS 140-3 payment terminal, utility interconnection prep, and transformer upgrades. | $85,000 – $190,000+ / station |
| Microgrid & BESS Integration | 100kWh – 250kWh Battery Energy Storage System (BESS), solar/grid offloading controller, dynamic peak-shaving software integration. | $75,000 – $175,000 / site |
| Managed Network & Telemetry (SaaS) | OCPP 1.6/2.0.1 cloud backhaul management, automated billing, load balancing algorithms, and continuous SLA hardware maintenance. | $1,500 – $3,100 / port / year |
Granular Line-Item Cost Structure
Level 2 Component Breakdown
- Hardware Pedestal: $4,500 – $7,500
- Site Telemetry Gateway: $1,200 – $2,500
- Civil Trenching & Electrical: $3,000 – $8,000
DC Fast Charger Component Breakdown
- High-Output Dispenser: $50,000 – $110,000
- FIPS Cyber-Hardened Gateway: $3,500 – $6,000
- Utility Interconnect / Transformer: $25,000 – $75,000+
Request EV Infrastructure Proposal
Submit your site parameters to receive a custom hardware schedule and TELP financing estimate.
Select Deployment Tier
Level 2 Commercial / Fleet ($8.7k–$18k/unit)
Level 3 DC Fast Charging ($85k–$190k/unit)
Solar + BESS Microgrid ($75k–$175k)
Full Municipal Fleet Electrification Package
© St. Sovereign LLC. Proprietary Energy Infrastructure. Protected under CUTSA trade secret guidelines.
